Permit First
The application names the certified decommissioner and both work dates. It comes back stamped Approved to Proceed.
No permit is issued afterwardsPermitted removal and fill in place across the city and King County, with the report filed inside thirty days.

The address is enough to start.
Most people arrive here because someone else asked for proof. An agent, a buyer, a lender or a relative clearing an estate. Pick the line closest to where you are.
A decommissioning record filed with the Seattle Fire Department shows the permit was issued and the report came back. It does not say whether the tank was pulled or filled in place, and it does not say anything about the soil. Read which method was used before you rely on it in a sale.
Two numbers behave differently. The permit is fixed and public: Seattle Fire Department Permit Code 6103 is $184.00 per tank on the April 2026 application form, and a separate permit is required for each tank on the property. The work is quoted per property.
Published local figures put a fill in place with no contamination at roughly $700 to $1,000, and a full excavation and removal with no contamination at roughly $5,000 to $10,000. Those bands come from a Seattle home inspection firm rather than from us, and they move the moment contaminated soil is involved.
We do not publish our own price list yet. Ask for a written quote and you get a figure for your property rather than a band from someone else’s.
Seattle recognizes two. The tank comes out of the ground, or it is emptied, triple rinsed and filled with an inert solid such as sand, concrete slurry or foam. Both are decommissioning under the Seattle Fire Code and both need the same permit.
The Fire Department is unusually direct about the choice. It advises that a tank suspected of leaking should be removed rather than abandoned, and it states plainly that it cannot predict what future regulations will require of tanks left in the ground, so a tank filled today may have to come out later at additional cost.
If a sale is driving the timing, that warning matters more than the price gap. A buyer’s agent reading a fill in place record will sometimes ask for removal anyway. Selling a house with a tank covers how that negotiation usually runs.
Same county, same tank, two different regimes. Which side of the Seattle city limit the property sits on changes the fee, the certificate and whether anyone inspects.
Seattle Fire Department, Fire Prevention Division.
Department of Local Services, Permitting Division.
Seattle figures from the Permit Code 6103 application form, revision 04/26. King County figures from the Permitting Division handout dated June 2024. Both are linked on the sources page.
Nothing here is optional and the order is not flexible. The single most common way a Seattle decommissioning goes wrong is the work happening first, because the Fire Department will not issue a permit after the fact.
The application names the certified decommissioner and both work dates. It comes back stamped Approved to Proceed.
No permit is issued afterwardsThe tank is emptied and the interior triple rinsed to take out residual product and bottom sludge.
Disposal receiptedThe tank is filled with an inert solid or excavated and taken away, with the certified decommissioner on site throughout.
Certificate held on fileThe decommissioning report goes to the Fire Department, and your copy arrives inside the same window.
Thirty days from completionIf either work date moves, the Fire Marshal’s Office has to be told in writing or in person by 9:00 am on the day the work actually happens. The form is blunt about the consequence: failure to do that renders the permit invalid.
Seattle Fire Department guidance states that compliance with the fire code does not require a site plan or soil samples. That surprises most people. It does not mean the soil is fine, only that the permit does not ask.
If a tank has leaked, reporting and cleanup run through the Washington State Department of Ecology under separate law. The Fire Department says as much in its own guidance and points to Ecology’s Northwest Regional Office.
The Pollution Liability Insurance Agency runs a Heating Oil Loan and Grant Program worth up to $75,000 per applicant, including a cleanup grant of up to $60,000 for a single tank. Eligibility is theirs to decide, not ours. See the Washington rules.
Seattle passed a 24 cents per gallon heating oil tax in 2019, delayed it three times and then repealed it, with the repeal signed in December 2022. Content still describing it as coming is out of date.
Across Seattle, including Ballard, Wallingford, Greenwood, Phinney Ridge, Ravenna, Bryant, Wedgwood, Laurelhurst and the rest of the city.
And in unincorporated King County, where the permit rules change: White Center, Skyway, Bryn Mawr, Fairwood, Klahanie, Cottage Lake, Hollywood Hill. Neighboring cities such as Shoreline, Burien, Tukwila and Renton run their own fire permits, so tell us the address and we will say which counter the application goes to.
Fewer than 10,000 Seattle homes still heat with oil, out of more than 180,000, on the city’s own November 2025 figure. It is a small pool of properties and an old one, which is why so many of these jobs surface during a sale.
Tell us the property address and what you have been asked for. You get a written quote by email, and a straight answer on which permit applies before anyone books a date.